Project list
Sign in to your account
With project lists you can...
- Create multiple lists
- Plan out the products you need for your project
- Add your completed Project List directly to your cart
Please sign in or create an account to use Project Lists
Project list
Sign in to your account
With project lists you can...
Please sign in or create an account to use Project Lists
First unpack all of the parts of the wall drying cupboard kit and lay them out. Make sure you read the instructions to identify all of the parts. To protect the cupboard as you build it, unfold the box and lay it on the floor.
Insert the cams into the rail, with the arrow pointing towards the outside. Attach the rail by putting the pre-drilled holes on the side into the pins. Make sure the cams are on the outside of the cupboard, so you won't see them when you open the door. Secure the rail by tightening the cams with a screwdriver.
You can identify the top panel because it has pre-drilled holes at the top and bottom for the hinges to be attached. Insert the six pins and tighten them with a cordless drill. Insert the four cams, keeping the arrow pointing to the outside of the panel. Insert the seven cams into each of the rails. Put the two rails onto the top panel, keeping the cam locks on the outside. Now tighten them with a screwdriver.
Put one of the panels on the end of the cupboard by gently tapping the pins into the cam locks. Then tighten the locks with a screwdriver. Turn the cupboard over and put the bottom panel on in the same way. Attach the other end panel by putting the pins into the cam locks and tighten the locks with a screwdriver. At this stage, check to make sure that all of the cam locks are tightened.
Place the back panel onto the cabinet, with the white side facing in. This is so that when you open the cabinet door, it's all white laminate inside. Use a hammer to nail the panel into the rebated edge of the cupboard.
The spacers need to be screwed on the inside of the cupboard at either end, so you can attach the runners to them. The first spacer to attach has pre-drilled holes in a straight line. If you're unsure, check the instructions. Turn the cabinet onto its end and use a drill to fasten the spacer to its side. Make sure the laminated, white edge is pointing to the front of the cabinet. Place the other spacer on top of the first and use a drill and screws to fix it in place. Repeat this process at the other end of the cupboard.
Remove the runners from both sides of the drying rack by extending them and pulling back on the black tab. Pull the runners away from the drying rack to separate them. To attach these to the cupboard, slide the runner forward and lay it on the spacer. Make sure it lines up with the pre-drilled holes at the back of spacer. Secure it using your drill and screws. Now slide the runner back until you see the second pre-drilled hole and use your drill and screw to attach it to the spacer. Repeat this process to attach the runner on the other side of the cabinet.
Line up the drying rails with the runners you have installed. You do this by aligning the grooves on both ends. Then slowly push the drying rack into place in the cupboard.
Now you are ready to fit the door. Remove the hinge plate from the hinge by pressing the button on the end of the hinge plate. Screw the two hinges into the pre-drilled holes in the cupboard door. Line up the fixings for the gas struts with the pre-drilled holes on the door and screw them in at the top and bottom. The knuckle part of the fixing needs to face inwards. Attach the other fixings for the gas strut onto the side walls. Then attach the hinge plates on the other side of the cupboard door.
Line up the hinges on the door with the hinge plates in the cupboard and clip them together to attach the door. Attach the gas struts on either side of the cupboard. Line up the strut with the fixings and clip them together.
Asbestos, lead-based paints and copper chromium arsenic (CCA) treated timber are health hazards you need to look out for when renovating older homes. These substances can easily be disturbed when renovating and exposure to them can cause a range of life-threatening diseases and conditions including cancer. For information on the dangers of asbestos, lead-based paint and CCA treated timber and tips for dealing with these materials contact your local council's Environmental Health Officer or visit our Health & Safety page.
When following our advice in our D.I.Y. videos, make sure you use all equipment, including PPE, safely by following the manufacturer’s instructions. Check that the equipment is suitable for the task and that PPE fits properly. If you are unsure, hire an expert to do the job or talk to a Bunnings Team Member.